Infrastructure
Third Bosphorus Bridge
Specialist labour operations for the pylons, built with slipform on a 24-hour basis
Projects / Infrastructure
Retaining walls of the Gebze–Haydarpaşa high speed line, and formwork systems for 11 immersed tunnel sections of 110 to 132 m.
Infrastructure
Specialist labour operations for the pylons, built with slipform on a 24-hour basis
Infrastructure
NATO and 3rd Army regional headquarters building; 3,000 m of surrounding concrete walls