Infrastructure
Third Bosphorus Bridge
Specialist labour operations for the pylons, built with slipform on a 24-hour basis
Projects / Infrastructure
One of the most congested intersections of Istanbul, consisting of two underground tunnels and three bridge parts. The headquarters building and over 3,000 m of surrounding concrete walls were built within the scope of the project.
Infrastructure
Specialist labour operations for the pylons, built with slipform on a 24-hour basis