Infrastructure
Third Bosphorus Bridge
Specialist labour operations for the pylons, built with slipform on a 24-hour basis
References
Infrastructure
Specialist labour operations for the pylons, built with slipform on a 24-hour basis
Infrastructure
NATO and 3rd Army regional headquarters building; 3,000 m of surrounding concrete walls
Infrastructure
Infrastructure